.. _assumptions-lcc: ================================= Life Cycle Cost model assumptions ================================= The following assumptions have been made in the calculation of the Life Cycle Cost (LCC). * Each powertrain component’s production cost is defined as its purchase cost. * The costs of the DC bus and DC splitter are neglected due to their close association with the DC cable. * Engines and propellers operational costs are the overhaul cost divided by Time Between Overhauls (TBO). * Electric sources and electronics operational costs are their replacement cost divided by their lifespan. * The purchase cost of the electronics are estimated with $/kW or $/A ratios derived from retail prices. * Storage tanks and gearboxes maintenance costs are included in the aircraft’s annual maintenance. * In the DC cable model, the shield and core unit costs are set equal, as are the insulation and sheath costs.